阿摩線上測驗
登入
首頁
>
輪機工程(概要)(包括推進裝置、輔機與輪機英文)
> 112年 - 112-2 交通部航港局船員岸上晉升適任性評估筆試測驗_一等大管輪:輪機英文(實作)#116857
112年 - 112-2 交通部航港局船員岸上晉升適任性評估筆試測驗_一等大管輪:輪機英文(實作)#116857
科目:
輪機工程(概要)(包括推進裝置、輔機與輪機英文) |
年份:
112年 |
選擇題數:
0 |
申論題數:
48
試卷資訊
所屬科目:
輪機工程(概要)(包括推進裝置、輔機與輪機英文)
選擇題 (0)
申論題 (48)
1.輪機日誌
2. 噴油器
3. 艙底水泵
4.油分離器
5. 液壓甲板機械
6. 自動清洗式淨油機
7. 吹灰
8.氣鎖
9. 示功閥(旋塞)
10.污油艙(櫃)
1. IOPP Cert.
2. ACB
3. PSC
4. WHR
5. COP
6. GWP
7. VOC
8. EEDI
9. A/E
10. SBE
1. Enter the measured figures in the engine logbook.
2. Will you ask the fourth engineer to try out this windlass?
3. What were your major items of your last repair?
4. Shift from anchorage to pier No. 5 at 0840.
5. Ask the bridge for permission before stopping the main generator in case of accident.
6. I'll ask the 2/E to accompany you to the spot.
7. How often do you test the emergency generator?
8. Prime the pump with water.
9. Make up water in each expansion tank.
10. Let's discuss it on the spot.
Dialogue 1 taking over emergency equipment (1%)
A: Would you please show me where the emergency bilge valve is? (1%)
B: It's over there, at the left side of main engine. (1%)
Dialogue 2 Parallel operation (1%)
A: Could you show me the parallel operation? (1%)
B: Regulate the voltage and frequency first. Then watch the synchroscope. While
the pointer is running slowly clockwise, turn on the breaker when the pointer is at 11. (2%)
Dialogue 3 Taking over the freshwater generator (1%)
A: How much water can it produce a day? (1%)
B: Its designed capacity is 29 tons, but it can't distill so much at present. (1%)
A: What's the matter? How much can it produce? (1%)
B: Only 20 tons. I think it's due to the scale and air leakage. (2%)
Dialogue 4 Inquiring (1%)
A: How many basic ways are there for fire-fighting? What are they? (1%)
B: There are several ways: isolating mode, stifling mode, cooling mode and chemical inhibiting mode. (2%)
A: Could you tell me how to use the dry powder extinguisher? (1%)
B: Hold the forward part of the rubber spray tube with one hand and aim it at the burning object, then pull the lift ring up and hold the handle with the other hand.(2%)
1. Q1: How do you keep a good engineering watch? (1%)
2. The officer of the engineering watch must be acquainted with the normal operating conditions for the machinery and all relevant watch instructions. (2%)
3. If failure occurs in machinery or equipment that may cause departure from normal operating conditions, the chief engineer must be notified immediately. (2%)
4. Oil leakages from pipelines or equipment must be attended to immediately. (1%)
5. Sea valves which are not in use shall be kept closed. (1%)
6. The level in service tanks for oil and water must be adequate to ensure normal operation during all weather conditions. (2%)
7. Discharges from tanks or bilges which may contain oil must pass through a bilge water separator. (1%)
8. Q2: What are the operational items for other equipment essential in emergency situations frequently inspected by Port State Control Officer? (2%)
9. Starting and maintenance of lifeboat engine/or rescue boat engine. (1%)
10. Local control procedures for those systems which are normally controlled from the navigating bridge. (1%)
11. Use of the emergency and fully independent sources of electrical power or radio installations.(2%)
12. Maintenance procedures for batteries. (1%)
13. Emergency stops, fire detection and alarm systems; operation of watertight and fire doors. (1%)
14. Change of control from automatic to manual for cooling water and lube oil systems from main and auxiliary systems. (2%)