【阿摩網站-置頂欄顏色票選問卷】只要填寫就能獲得500Y,結束時間 2024/04/25 11:59:59。 前往查看

高考◆英语◆江苏省題庫下載題庫

上一題
A new eight-kilometre road is under construction that links the port area with the motorway system . It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city . As part of the project , two four-kilometre road tunnels are being built below the central area of the city , one for traffic to the north and the other for traffic to the south .The two tunnels are about 20 metres below the surface and are 12 metres wide , providing for two lanes of traffic in each direction . In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel . The lighting is at the top of the tunnel , practically at its highest point . There will also be electronic signs at frequent intervals (间隔). They show traffic conditions ahead , and can be seen clearly by drivers . The wall is made up of four main elements , which include a waterproofing covering and , on the inside of the tunnel , a concrete lining (混凝土衬砌). Each tunnel is roughly round and the lower part of the tunnel is somewhat flat .The surface of the road lies on the base , which is made of concrete and steel The drainage system (排水系统), just below the road surface on one side , removes any extra liquid , particularly water . In the event of fire , the fire main , which is made of steel , pipes water to many fire hydrant stations at regular intervals along the length of the tunnel . The fire main is at the side of the tunnel , and at the level of the road surface . Other systems in the tunnel will include emergency phones .
【題組】74.Driving in the tunnel , one can know the traffic conditions ahead through .
(A)the lights
(B)the electronic signs
(C)the trucks and cars
(D)the emergency phones


答案:B
難度: 計算中

A new eight-kilometre road is under cons..-阿摩線上測驗