【2024/12/02~12/31活動加碼】填單免費領取1次WUWOW英文健檢及14天阿摩VIP,在活動加碼期間填寫可以再參加 WUWOW 10週年抽獎活動! 前往查看

輪機工程(概要)(包括推進裝置、輔機與輪機英文)題庫下載題庫

上一題
6. 大管輪於機艙控制室進行主機正倒車試車之英文為Tried ___________ of Main Engine have been conducted in Engine Control Room by Second Engineer,其空格為下列何者?
(A) left and right
(B) ahead and astern
(C) inward and outward
(D) upward and downward


6. 大管輪於機艙控制室進行主機正倒車試車之英文為Tried _________..-阿摩線上測驗