高中(學測,指考)◆英文題庫下載題庫

上一題
五、閱讀測驗 ( 占 3 2分 ) 說明︰第36題至51題,每題請分別根據各篇文章之文意選出最適當的一個選項,請劃記在 答案卡之「選擇題答案區」。各題答對者,得2分;答錯、未作答或劃記多於一個 選項者,該題以零分計算。
第 36 至 39 題為題組
        Located in Black Canyon straddling the border between Nevada and Arizona in the southwestern region of the United States, Hoover Dam is named one of the Top 10 Construction Achievements of the 20th century. The dam, constructed between 1931 and 1936, was the largest of its kind at the time. Its construction was the result of a massive effort involving thousands of workers and cost over one hundred lives.
        Since about 1900, the Black Canyon and nearby Boulder Canyon had been investigated for their potential to support a dam that would control floods, provide irrigation water, and produce hydroelectric power. In 1928, the US Congress authorized the project. The winning bid to build the dam was submitted by Six Companies, Inc. However, such a large concrete structure had never been built before, and some of the techniques were unproven. The extreme summer heat and lack of facilities near the site also presented tremendous difficulties. Nevertheless, Six Companies turned over the finished dam to the federal government on March 1, 1936, more than two years ahead of schedule.
       The initial design of the dam, which was more concerned with the dam’s functionality than its exterior, was criticized by many as being too plain and unremarkable for a project of such immense scale. So Gordon B. Kaufmann, the architect who was brought in to redesign the exterior, greatly streamlined the design and applied an elegant Art Deco style to the entire project. Allen Tupper True, an American illustrator, was also hired to handle the design and decoration of the walls and floors of the new dam. He integrated into his design the images and colors based on Native American visions of rain, lightning, clouds, and animals, thereby creating symbolic patterns which appear both ancient and modern.
        Today, Hoover Dam has become a national historic landmark. Standing at more than 725 feet above the Colorado River, the highest concrete dam in the Western Hemisphere continues to draw crowds 85 years after its creation, attracting more than a million visitors a year.

【題組】38. According to the passage, what did Six Companies, Inc. experience in the process of building the dam?
(A) It was defeated by the harsh working conditions.
(B) It lost some workers in the construction of the dam.
(C) It benefited from prior experience of building dams of similar scale.
(D) It gave up the project authorized by the government before the deadline.


答案:登入後觀看
難度: 適中

10
 【站僕】摩檸Morning:有沒有達人來解釋一下?
倒數 9時 ,已有 2 則答案
海關 國三下 (2021/11/16):

   Located in Black Canyon straddling the border between Nevada and Arizona in the southwestern region of the United States, Hoover Dam is named one of the Top 10 Construction Achievements of the 20th century. The dam, constructed between 1931 and 1936, was the largest of its kind at the time. Its construction was the result of a massive effort involving thousands of workers and cost over one hundred lives.
        Since about 1900, the Black Canyon and nearby Boulder Canyon had been investigated for their potential to support a dam that would control floods, provide irrigation water, and produce hydroelectric power. In 1928, the US Congress authorized the project. The winning bid to build the dam was submitted by Six Companies, Inc. However, such a large concrete structure had never been built before, and some of the techniques were unproven. The extreme summer heat and lack of facilities near the site also presented tremendous difficulties. Nevertheless, Six Companies turned over the finished dam to the federal government on March 1, 1936, more than two years ahead of schedule.


由文章可知dam的建造是由Six Companies, Inc承包,但是困難重重,dam的建造是幾千名工人努力的成果(當時也犧牲了100多條生命),最終成功。

5個讚
檢舉
chaochao.hsie 高三上 (2024/10/30):

Turn over 移交

在工程預定完成期限兩年之前就把完建的水壩轉交給聯邦政府
所以turn over不是放棄喔
0個讚
檢舉


五、閱讀測驗 ( 占 3 2分 ) 說明︰第36題至51題,每題請分別根據各篇..-阿摩線上測驗