61. What additional instruction does the woman give?
(A) Hire a new architect.
(B) Apply for a different permit.
(C) Contact the city inspector.
(D) Verify measurements for another feature.

答案:登入後查看
統計: A(6), B(29), C(38), D(135), E(0) #3823031

詳解 (共 2 筆)

#7586444

Questions 59 through 61 refer to the following conversation.
Miss Lopez, we have a compliance issue with the blueprints for the new library win.The city inspector just informed us that the wheelchair ramp was too steep, according to the updated accessibility codes.That is a serious oversight. The concrete has already been poured for that section. Fixing it will require breaking up the foundation. I know. However, if we don't fix it, we won't get the occupancy permit.And have the cruise star demolition tomorrow morning.They're it. And please double check the railing height specifications as well. I don't want anymore surprises during the final inspection.

第 59 至 61 題指的是以下對話。

洛佩茲小姐,我們新圖書館的藍圖有合規性問題。市政檢查員剛剛告知我們,根據最新的無障礙規範,輪椅坡道的坡度過陡。這是一個嚴重的疏忽。那部分的混凝土已經澆築完畢。要修復這個問題,就需要拆除地基。我知道。但是,如果我們不修復,就拿不到入住許可證。而且明天早上就要讓 Cruise Star 公司來拆除。他們負責拆除。另外,請您再仔細檢查欄桿的高度規格。我不想在最終驗收時再出現任何意外。

0
0
#7510991

Ms. Lopez, we have a compliance issue(法規問題) with the blueprints(設計藍圖) for the new library wing(圖書館側翼). The city inspector just informed us that the wheelchair ramp(輪椅坡道) is too steep according to the updated accessibility codes(新的無障礙規範).

That is a serious oversight(嚴重的疏忽). The concrete has already been poured for that section. Fixing it will require breaking up the foundation.

I know. However, if we don't fix it, we won't get the occupancy permit(使用許可). I can have the crew start demolition(拆除工程) tomorrow morning,

Good, and please double check the railling height(欄杆高度) specifications(規格) as well. I don't want any more surprises during the final inspection.

0
0