168. Why is the renovation project delayed?
(A) A specific material is unavailable.
(B) The construction crew is on strike.
(C) The client changed the design plans.
(D) The budget was reduced.

答案:登入後查看
統計: A(32), B(0), C(0), D(0), E(0) #3823188

私人筆記 (共 1 筆)

私人筆記#7870756
未解鎖
答案是:(A) A specific ...
(共 569 字,隱藏中)
前往觀看
0
0