168. Why is the renovation project delayed?
(A) A specific material is unavailable.
(B) The construction crew is on strike.
(C) The client changed the design plans.
(D) The budget was reduced.
答案:登入後查看
統計: A(71), B(4), C(1), D(1), E(0) #3823188
統計: A(71), B(4), C(1), D(1), E(0) #3823188