【閱讀下文,回答第25至28題】
The Tamkang Bridge (淡江大橋) has been under construction since 2019 and is ready for use this year. It was built because the Tamsui (淡水) and Bali (八里) areas have grown quickly in recent years, and more people now commute between them. Once it opens, people can save about half an hour when traveling between the two places. Besides making ___25___ smooth, the bridge will also appeal to visitors with its special architectural style. It was designed by the world-famous architect Zaha Hadid. Being the first bridge in Taiwan ___26___ through an international design competition, the Tamkang Bridge will become the world's longest single-tower asymmetric cable-stayed bridge (單塔不對稱斜張橋). Expressing a sense of art and beauty, the bridge's 200-meter tower rises into the sky, ___27___ a dancer were lifting both hands in prayer. Moreover, the bridge's shape goes well with the sunset over the Tamsui River, making the view much more eye-catching. Visitors can appreciate the riverside views here. With shorter travel time between Tamsui and Bali and its unique beauty, the Tamkang Bridge will play an important role in both ___28___. The bridge will definitely bring travel convenience and recreational benefits to the people of northern Taiwan.

25.
(A) air quality

(B) traffic flow

(C) water safety

(D) local culture

答案:登入後查看
統計: 尚無統計資料