6. What entries in general, should be timely made in the engine log book?
(A) All the events encountered during the duty watch.
(B) Work being done on last voyage.
(C) Job order on next calling port.
(D) Time of next overhaul of Main Engine.
答案:登入後查看
統計: A(815), B(107), C(68), D(139), E(0) #3077143
統計: A(815), B(107), C(68), D(139), E(0) #3077143