ch17-1
Routers R1 and R2 connect using a leased line, with both routers using their respective
Serial 0/0 interfaces. The routers can currently route packets over the link, which uses
HDLC Which of the following commands would be required to migrate the
configuration to use PPP? (A) encapsulation ppp (B) no encapsulation hdlc (C) clock rate 128000 (D) bandwidth 128000