4. Stand by on VHF channel 13 until the pilot transfer completed.
(A) Watch on VHF CH 13 until pilot transfer begins.
(B) Watch on VHF CH 13 during the period of pilot transfer.
(C) Do not use VHF CH 13 before pilot transfer is completed.
(D) Afet pilot transfer is completed, you should stand by on VHF CH 13.
7. Your vessel is proceeding parallel with a coastal line, your speed is 15 knots and distance
to coast line is 5 nautical miles. What is the best position fixing intervals you should take in this
area?
(A) 10 minutes.
(B) 20 minutes.
(C) 30 minutes.
(D) 40 minutes.
11. By SMCP, Which of the following statements is TRUE?
(A) ADVICE.Anchor in anchorage B 3
(B) You could anchor in anchorage B 3
(C) You could, I think, anchor in anchorage B 3
(D) You should anchor in anchorage B 3
16. The term “any vessel fishing with nets, trawls or other fishing apparatus which restrict
manoeuvrability, but does not include a vessel fishing with trolling lines or other fishing apparatus
which do not restrict manoeuvrability” means:
(A) vessel engaged in fishing
(B) vessel not under command
(C) vessel restricted in her ability to manoeuvre
(D) vessel constrained by her draught
17. Please proceed to the Western Quarantine Anchorage and drop anchor 240 degrees 3
miles from the entrance buoy.
(A) This is transit information.
(B) This is an anchoring instruction.
(C) This is a berthing instruction.
(D) This is tide information.
19. A: I have dropped anchor at 1415 hours, position 070 degrees 1.5 Nms from the
northbank lighthouse. When can I expect the pilot to come? Over. B: The pilot will board your ship
at 0800 hours tomorrow morning. Question: When will the pilot on board?
(A) 0700 hours tomorrow morning
(B) 0800 hours tomorrow morning
(C) 1415 hours tomorrow
(D) 1800 hours tomorrow
20. ______ is the line at a ship's side formed by the surface of water at a specific draught.
(A) Headline
(B) For and after center line
(C) Waterline
(D) Stern line
21. ______ at the pilot station is 0900 hours for the pilot to embark the vessel for calling at
Port of Keelung.
(A) Estimated Time of Arrival
(B) Estimated Time of Approval
(C) Estimated Time of Assembly
(D) Estimated Time of Assailment
31. 翻譯:有兩只貨櫃被沖擊落水。
(A) Two containers were washed overboard.
(B) Two containers were transferred overboard.
(C) Two containers were shifted overboard.
(D) Two containers were missed overboard.
32. The term of “ETA” means that:
(A) Established Time of Arrival.
(B) Estimated Time of Arrival.
(C) Elapsed Time of Arrival.
(D) Escorted Time of Arrival.
33. The EBB TIDE means:
(A) The tide is to the lowest level.
(B) The tide is reaching to the highest level.
(C) The tide is rising from low water to high water.
(D) The tide is falling from high water to low water.
35. Any ship having dangerous list should commence the _____ traffic frequency to require
assistance immediately.
(A) maritime
(B) recreation
(C) fishery
(D) distress