阿摩線上測驗 登入

最新科目

最新試卷

最新試題

最新申論題

Q2: How do you carry out hot work in an oil tank?A:Before hot work is commenced, the tank should be isolated, cleaned (drained) and gas freed.Ventilation is maintained in areas where hot work shall be performed.Areas where burning or glowing material or sparks may fall down shall be thoroughly cleaned and covered with water.The atmosphere in tanks where hot work shall be performed and in adjoining tanks and rooms shall be checked less than 1 hour before hot work is commenced.During the work, gas measurement shall be taken at least every second hour, and always less than 1 hour before work commences on a new day or after work has stopped for a duration of time.A fire watch shall always be posted in the area where hot work in carried out. The fire watch shall have at his disposal at least two powder apparatuses ready for immediate use.

Q1: What preparation procedures shall be carried out before departure?A:1. One hour prior to SBE, the following shall be an entry made in the Bell Book and verify:(1) Main engine telegraph and ship's clock.(2) Emergency main engine telegraph.(3) Steering gear operation. Both steering gear power units shall be put into operation.2. The main engine cylinder shall be fed cylinder oil and the main engine shall be turned by engaging the turning gear for about 10 minutes then be disengaged.3. The stand-by diesel engine generator shall be started and put into service.4. The necessary pumps shall be started.5. Starting manifold drain valves shall be shut and the starting air outlet valve of the air reservoirs shall be opened.6. After confirming with the Duty Officer that the propeller and gangway are clear and cargo work has been completed the main engine shall be air blown on in ahead and astern directions from the control console in the engine control room.7. The main engine indicator cocks shall be closed after the main engine is blown through.

四、請將下列對話翻譯成中文 (20%)Dialogue 1 Inspection of emergency generatorA: Please start the emergency generator and keep it running for half an hour.B: No problem. The emergency generator is starting now.A: Check the emergency switchboard.B: It's in a good condition, sir.A: Can the emergency generator be started automatically when the main power supply fails?B: Yes. It can be started automatically or we start it at its location.A: Is there a change-over switch?B: Yes. Here it is.Dialogue 2 Taking over the exhaust boilerA: Please tell me something about the exhaust boiler.B: It is a fire tube boiler. The capacity is 1.0 ton per hour; the heating surface is 150 m².A: How much is the working pressure?B: 0.4 MPa.A: When did you clean it last?B: Last month.A: How often do you analyze the boiler water?B: It is done in accordance with the product statements of the company.Dialogue 3 Talking about pump arrangementsA: How are the pumps arranged?B: This is the arrangement diagram. Look, this is the bilge pump, and this is the freshwater pump.A: Where is the ballast pump?B: It's over there.A: What's the output of one ballast pump?B: About 100 m³/h.A: Do you test the emergency fire pump regularly?B: Yes, I do.

最新課程

最新主題筆記

最新討論

61.王小姐出現產後憂鬱症,但仍希望哺餵母乳。下列那一個抗憂鬱劑較安全? (A)sertraline (B)paroxetine (C)fluoxetine (D)citalopram

42 近用視標有許多種標示文字大小方式。N 標示法(N-notation)是現代電腦文書編輯及列表機常用的方式。 在 40 cm 的近用距離測量下,書籍常用的 N12 若換算成史耐倫等價視力(Snellen equivalent)相當於下列 何者? (A) 20/20 (B) 20/40 (C) 20/60 (D) 20/80

47.關於恆牙與乳牙牙釉質酸蝕時間的敘述,下列何者正確? (A)恆牙牙釉質較厚,所需酸蝕時間較長 (B)恆牙牙釉稜柱(enamel prism)較大,所需酸蝕時間較長 (C)乳牙無稜柱牙釉質(aprismatic enamel)較多,所需酸蝕時間較長 (D)乳牙礦化程度較低,所需酸蝕時間較長

9. Since the queen is very powerful in the game of chess, a novice usually brings out the queen quickly, hoping to ________ the opponent. (A)interrupt (B) interject (C) interrogate (D) intimate (E) intimidate

51.對大多數的物質而言,在下列那一種光與物質的交互作用下,其質量衰減係數會非常相似?(A)光電效應(B)康普吞效應(C)成對發生(D)光核蛻變

21 關於行政執行法上之即時強制,下列敘述何者錯誤? (A)非以行政處分所生義務之履行為前提(B)其方法包括對住宅、建築物或其他處所之進入(C)請求財產損失補償,其範圍不包括實際所受之特別損失(D)對人之管束,不得逾 24 小時