33 The manager was ________ that the project would be completed on time.
(A) Artistic
(B) automatic
(C) optimistic
(D) dramatic
答案:登入後查看
統計: A(6), B(40), C(243), D(13), E(0) #3765487
統計: A(6), B(40), C(243), D(13), E(0) #3765487