ch17-1 Routers R1 and R2 connect using a leased line, with both routers using their respective Serial 0/0 interfaces. The routers can currently route packets over the link, which uses HDLC Which of the following commands would be required to migrate the configuration to use PPP?
(A) encapsulation ppp
(B) no encapsulation hdlc
(C) clock rate 128000
(D) bandwidth 128000

答案:登入後查看
統計: A(56), B(53), C(58), D(13), E(0) #186101