阿摩線上測驗 登入

最新科目

最新試卷

115年 - 115 國立台北教育大學師資培育處_各類料教育學程暨小學雙語模組甄選複審試題:國語文#144702(35題)

115年 - 115 國立台北教育大學師資培育處_各類料教育學程暨小學雙語模組甄選複審試題:教育心理學#144701(2題)

115年 - 115 臺北自來水事業處及所屬工程總隊_新進職員(工)甄試試題_職員—四級工程師/助理工程師/助理管理師_共同科目:自來水法規#144700(15題)

115年 - 115 臺北自來水事業處及所屬工程總隊_新進職員(工)甄試試題_職員—四級工程師/助理工程師/助理管理師_共同科目:國文(作文)#144699(1題)

115年 - 115 臺北自來水事業處及所屬工程總隊_新進職員(工)甄試試題_職員—四級工程師:自來水工程#144698(50題)

115年 - 115 台灣自來水股份有限公司_評價職位人員甄試試題_技術士化驗類:高中(職)分析化學及水質檢驗操作須知#144692(50題)

115年 - 115 台灣自來水股份有限公司_評價職位人員甄試試題_技術士工程類:高中(職)土木及水管埋設施工#144691(50題)

115年 - 115 台灣自來水股份有限公司_評價職位人員甄試試題_技術士操作類-乙(淨水、管線、水源)、技術士化驗類:高中(職)物理化學#144690(50題)

115年 - 115 台灣自來水股份有限公司_評價職位人員甄試試題_技術士裝修類-甲(新裝、修漏):高中(職)配管裝修#144689(50題)

115年 - 115 台灣自來水股份有限公司_評價職位人員甄試試題_技術士操作類-甲(機電):電機(工)機械#144686(50題)

最新試題

最新申論題

最新課程

最新主題筆記

最新討論

48 Based on the passage, what percentage of Tangshan’s buildings were destroyed? (A)Approximately 97 percent. (B)Exactly 50 percent. (C)Around 24 percent. (D)Nearly 100 percent of only industrial buildings.

49 How did the Tangshan earthquake differ from the Haicheng earthquake that occurred a year earlier? (A)The Haicheng earthquake caused more damage to the power lines. (B)The Tangshan earthquake did not have successful early warnings. (C)The Tangshan earthquake happened in a region with no tectonic activity. (D)The Haicheng earthquake was much deadlier due to its timing.

50 Which of the following best summarizes the main purpose of the passage? (A)To emphasize the safety of underground structures like coal mines during natural disasters. (B)To provide a detailed comparison between the seismic activity in Tangshan and Haicheng. (C)To explain the causes and consequences of the Tangshan earthquake while highlighting its importance to modern safety. (D)To argue that the official death toll reported by the Chinese government was intentionally inaccurate.

20. ________ contains the list of crew, passengers and all on board and their functions in a distress or drill”. (A)Crew list (B)Drill list(C)Muster list (D)Emergency duty list

21. Please make sure the ____________ are clear for evacuating all crew. (A)escape routes (B)elevators (C)lifts (D)gangways

22. A navigational aid placed to act as a beacon or warning, this is a______. (A)seamark (B)landmark (C)load line mark (D)plimsoll mark