41. What was the main challenge the consortium faced when building the Oresund Bridge?
(A) They had to figure out how to build a bridge ten miles long.
(B) They had to find a way to build a bridge that would not obstruct air traffic.
(C) They had to decide whether to build a bridge or a tunnel.
(D) They had to find a way to build a bridge that would not block Denmark’s ship traffic.

答案:登入後查看
統計: A(2), B(1), C(1), D(0), E(0) #3268214

詳解 (共 1 筆)

#6427204
【題組】41. What was th...
(共 410 字,隱藏中)
前往觀看
0
1