14. 風險值(Value at Risk, VaR)的計算應於以下哪一個機率測度(probability measure)下進行?
(A)風險中立測度 (risk neutral measure)
(B)歷史測度 (historical measure)
(C)風險測度 (risk measure)
(D)以上皆可

答案:登入後查看
統計: A(7), B(7), C(2), D(2), E(0) #2914364